Guangxi Iron and Steel Group Co.
Publishdate:2023-06-10 Views:78
![]() |
|
4x60 holes 7.5m top loading coke oven flue gas denitrification project
Flue gas operating conditions for SCR denitrification units:
Flue gas volume:2x700000Nm³/h;
Operating temperature:180-200℃;
Process route:SDS dry desulfurization + bag filter + low temperature SCR denitrification |
4x60孔7.5m顶装焦炉烟气脱硝项目
SCR脱硝装置烟气运行条件:
烟气量:2x700000Nm³/h;
运行温度:180-200℃;
工艺路线:SDS干法脱硫+布袋除尘+低温SCR脱硝
