Shanxi TISCO Stainless Steel Co.
Publishdate:2023-06-10 Views:80
![]() |
|
660 square meters sintering flue gas low temperature denitrification project
Flue gas operating conditions for SCR denitrification units:
Flue gas volume:2112000Nm³/h(equipped with 2 sets of SCR devices);
Operating temperature:180℃;
Operation time: Header electric dedusting + activated carbon desulfurization and denitrification + hot air furnace + low temperature SCR denitrification |
660 square meters sintering flue gas low temperature denitrification project
Flue gas operating conditions for SCR denitrification units:
Flue gas volume:2112000Nm³/h(equipped with 2 sets of SCR devices);
Operating temperature:180℃;
Operation time: Header electric dedusting + activated carbon desulfurization and denitrification + hot air furnace + low temperature SCR denitrification
