Shanxi TISCO Stainless Steel Co.

Publishdate:2023-06-10 Views:27



660 square meters sintering flue gas low temperature denitrification project


Flue gas operating conditions for SCR denitrification units:


Flue gas volume:2112000Nm³/h(equipped with 2 sets of SCR devices);


Operating temperature:180℃;


Operation time: Header electric dedusting + activated carbon desulfurization and denitrification + hot air furnace + low temperature SCR denitrification



660 square meters sintering flue gas low temperature denitrification project


Flue gas operating conditions for SCR denitrification units:


Flue gas volume:2112000Nm³/h(equipped with 2 sets of SCR devices);


Operating temperature:180℃;


Operation time: Header electric dedusting + activated carbon desulfurization and denitrification + hot air furnace + low temperature SCR denitrification