On November 13th, Fangxin Lihua Technology assisted in the Fangchenggang Iron and Steel International Summit
Publishdate:2018-11-01 Views:41
The International Summit on Green Development of China's Steel Industry Chain will be held from November 13th to 16th in Fangchenggang, Guangxi, with an estimated scale of 1000 people. Beijing Fangxin Lihua Technology Co., Ltd. will attend the conference and win the "Energy Conservation and Environmental Protection Contribution Award". We welcome everyone to come and exchange ideas at that time. From November 13th to 16th, we will meet at Fangchenggang. See you and don't part ways!
International Summit on Green Development of China's Steel Industry Chain
Conference theme
Transforming and upgrading intelligent manufacturing to win the battle of blue sky defense
2、 Organizational structure
Organizer:
China Equipment Management Association
Co organizer:
Guangxi Shenglong Metallurgical Co., Ltd
German BSW Baden Steel Engineering Company
Tangshan Bohai Metallurgical Group
Magray (Beijing) Intelligent Technology Co., Ltd
Beijing Chenxi Environmental Protection Engineering Co., Ltd
Undertaking unit:
China Equipment Management Association Metallurgical Industry International Cooperation Service Center
Beijing Guolian Video Information Technology Co., Ltd
Metallurgical Craftsman WeChat Public Platform
Supporting units:
Vietnam Steel Corporation
United Steel (Malaysia) Group Co., Ltd
Heli Resources (Singapore) Limited
3、 Meeting content
Eight sections:
1. Interpretation of the Implementation Measures for Capacity Replacement in the Steel Industry;
2. Analysis of the Three Year Plan for Winning the Blue Sky Defense War in the Steel Industry
3. Introduction to the construction of a coastal steel base with a capacity of tens of millions of tons in Fangchenggang;
4. Exchange of advanced equipment management experience in Guangxi Shenglong Metallurgy;
5. The development trends and challenges of the German steel industry market;
6. Introduction to the status of the steel industry along the Southeast Asian route;
7. The list of innovative enterprises in the steel industry has been released;
8. Domestic and foreign steel companies plan to negotiate supply and demand coordination for ongoing projects.
Nine sessions:
1. The 13th Low Cost Ironmaking Technology Seminar;
2. Seminar on Collaborative Treatment of Multiple Pollutants in Sintering Smoke Desulfurization and Denitration, and Efficient Recovery and Utilization of Waste Heat and Pressure;
3. Energy conservation, environmental protection, and green development technology exchange and promotion conference in the coking industry;
4. 2018 Green Steel Rolling Energy Conservation and Consumption Reduction Seminar;
5. Seminar on Ultra Low Emission Technologies for Metallurgical Dust Removal and Smoke Control;
6. Seminar on Innovative Technologies for Energy Conservation and Environmental Protection in the Graphite and Carbon Industries;
7. 2018 Green Steel Making Technology, Equipment, and Material Application Seminar;
8. Annual Conference on Innovative Development of Lime Industry Equipment and Technical Exchange and Cooperation;
9. Seminar on Comprehensive Utilization Technology of Metallurgical Solid Waste.
4、 Meeting time and location
Time: November 13-16, 2018, reporting on November 13, 9 sub meetings will be held simultaneously on November 14, a summit is expected to be held on November 15 with a scale of 1000 people, and a visit to Guangxi Shenglong Metallurgical Co., Ltd. will be held on November 16.
Location: Gangchen International Hotel, Fangchenggang, Guangxi
5、 Transportation routes
The Solid Waste and Lime Special Branch of Guangxi Fangchenggang Gangchen International Hotel (No.1 Beibu Bay Avenue, Gangkou District, Fangchenggang City, Guangxi Province) was held at Shenzhen Airlines International Hotel.
The above hotel addresses are in the same location, and the transportation route is as follows:
1. Nanning Wuwei International Airport: You can take the airport bus or take a taxi to Nanning East Station, then take the high-speed train to Fangchenggang North (high-speed train station) and take a taxi to the hotel, which is expected to take half an hour;
The departure time from Nanning Wuwei International Airport to Fangchenggang Port Bus Station is 09:30, with a 1-hour interval. The last bus will depart at 22:40;
The departure time from Fangchenggang Port Bus Station to Nanning Wuwei International Airport is 06:00, with a 1-hour interval. The last bus departs at 19:00;
The distance from Nanning Wuwei International Airport to Fangchenggang is about 160 kilometers, and the entire high-speed journey takes about 2.5 hours;
Note: The above time is for reference, and the specific time is subject to the ticket center of the station.
2. Nanning East Station or Nanning Station: It takes about an hour by high-speed train to reach Fangchenggang Railway Station.
3. Arrive at Beihai Fucheng Airport by plane, transfer to train at Beihai Railway Station to Fangchenggang North (high-speed train station), and take a taxi to the hotel in about half an hour
The International Summit on Green Development of China's Steel Industry Chain will be held from November 13th to 16th in Fangchenggang, Guangxi, with an estimated scale of 1000 people. Beijing Fangxin Lihua Technology Co., Ltd. will attend the conference and win the "Energy Conservation and Environmental Protection Contribution Award". We welcome everyone to come and exchange ideas at that time. From November 13th to 16th, we will meet at Fangchenggang. See you and don't part ways!
International Summit on Green Development of China's Steel Industry Chain
Conference theme
Transforming and upgrading intelligent manufacturing to win the battle of blue sky defense
2、 Organizational structure
Organizer:
China Equipment Management Association
Co organizer:
Guangxi Shenglong Metallurgical Co., Ltd
German BSW Baden Steel Engineering Company
Tangshan Bohai Metallurgical Group
Magray (Beijing) Intelligent Technology Co., Ltd
Beijing Chenxi Environmental Protection Engineering Co., Ltd
Undertaking unit:
China Equipment Management Association Metallurgical Industry International Cooperation Service Center
Beijing Guolian Video Information Technology Co., Ltd
Metallurgical Craftsman WeChat Public Platform
Supporting units:
Vietnam Steel Corporation
United Steel (Malaysia) Group Co., Ltd
Heli Resources (Singapore) Limited
3、 Meeting content
Eight sections:
1. Interpretation of the Implementation Measures for Capacity Replacement in the Steel Industry;
2. Analysis of the Three Year Plan for Winning the Blue Sky Defense War in the Steel Industry
3. Introduction to the construction of a coastal steel base with a capacity of tens of millions of tons in Fangchenggang;
4. Exchange of advanced equipment management experience in Guangxi Shenglong Metallurgy;
5. The development trends and challenges of the German steel industry market;
6. Introduction to the status of the steel industry along the Southeast Asian route;
7. The list of innovative enterprises in the steel industry has been released;
8. Domestic and foreign steel companies plan to negotiate supply and demand coordination for ongoing projects.
Nine sessions:
1. The 13th Low Cost Ironmaking Technology Seminar;
2. Seminar on Collaborative Treatment of Multiple Pollutants in Sintering Smoke Desulfurization and Denitration, and Efficient Recovery and Utilization of Waste Heat and Pressure;
3. Energy conservation, environmental protection, and green development technology exchange and promotion conference in the coking industry;
4. 2018 Green Steel Rolling Energy Conservation and Consumption Reduction Seminar;
5. Seminar on Ultra Low Emission Technologies for Metallurgical Dust Removal and Smoke Control;
6. Seminar on Innovative Technologies for Energy Conservation and Environmental Protection in the Graphite and Carbon Industries;
7. 2018 Green Steel Making Technology, Equipment, and Material Application Seminar;
8. Annual Conference on Innovative Development of Lime Industry Equipment and Technical Exchange and Cooperation;
9. Seminar on Comprehensive Utilization Technology of Metallurgical Solid Waste.
4、 Meeting time and location
Time: November 13-16, 2018, reporting on November 13, 9 sub meetings will be held simultaneously on November 14, a summit is expected to be held on November 15 with a scale of 1000 people, and a visit to Guangxi Shenglong Metallurgical Co., Ltd. will be held on November 16.
Location: Gangchen International Hotel, Fangchenggang, Guangxi
5、 Transportation routes
The Solid Waste and Lime Special Branch of Guangxi Fangchenggang Gangchen International Hotel (No.1 Beibu Bay Avenue, Gangkou District, Fangchenggang City, Guangxi Province) was held at Shenzhen Airlines International Hotel.
The above hotel addresses are in the same location, and the transportation route is as follows:
1. Nanning Wuwei International Airport: You can take the airport bus or take a taxi to Nanning East Station, then take the high-speed train to Fangchenggang North (high-speed train station) and take a taxi to the hotel, which is expected to take half an hour;
The departure time from Nanning Wuwei International Airport to Fangchenggang Port Bus Station is 09:30, with a 1-hour interval. The last bus will depart at 22:40;
The departure time from Fangchenggang Port Bus Station to Nanning Wuwei International Airport is 06:00, with a 1-hour interval. The last bus departs at 19:00;
The distance from Nanning Wuwei International Airport to Fangchenggang is about 160 kilometers, and the entire high-speed journey takes about 2.5 hours;
Note: The above time is for reference, and the specific time is subject to the ticket center of the station.
2. Nanning East Station or Nanning Station: It takes about an hour by high-speed train to reach Fangchenggang Railway Station.
3. Arrive at Beihai Fucheng Airport by plane, transfer to train at Beihai Railway Station to Fangchenggang North (high-speed train station), and take a taxi to the hotel in about half an hour