GCL Group Limited (Inner Mongolia Xinyuan Project + Xinjiang GCL Project)
Publishdate:2023-06-10 Views:71
![]() |
|
28x33000KV-A Project for Denitrification of Silicon Flue Gas in Industry
Flue gas operating conditions for SCR denitrification units
Flue gas volume:28x265000Nm³/h;
Operating temperature:160-200℃;
Operation time:SDS dry-hydride desulfurization + bag filter + low-temperature SCR denitrification |
28x33000KV·A ⼯业硅烟⽓脱硝项⽬
SCR脱硝装置烟气运行条件:
烟气量:28x265000Nm³/h;
运行温度:160-200℃;
投运时间:SDS⼲法脱硫+布袋除尘+低温SCR 脱硝