Rizhao Steel Holding Group Co.

Publishdate:2023-06-10 Views:29



2×360㎡Sintering machine denitrification project


SCR denitrification unit flue gas operating conditions:


Flue gas volume:2×1480000Nm³/h;


Operating temperature:200-220℃;


Process route:limestone gypsum method of desulfurization + wet electric dedusting + GGH heat exchanger + hot blast furnace heating + low temperature SCR denitrification + GGH heat exchanger + induced draft fan


2×360㎡烧结机脱硝项目


SCR脱硝装置烟气运行条件:

烟气量:2×1480000Nm³/h;

运行温度:200-220℃;

工艺路线:石灰石石膏法脱硫+湿电除尘+GGH换热+热风炉升温+低温SCR脱硝+GGH换热+引风机